DH Grafite Processing Co., LDA located in Niassa Province, Mozambique, specializing in the mining and processing of natural flake graphite. The company owns the 9077C mine in the region. It is a super-large deposit, with proven ore resources of natural flake graphite reaching 350 million tons and mineral resources of natural flake graphite of 35 million tons, and the exploration is still ongoing.


The 9077C deposit is a rare, high-quality large flake graphite ore with an average grade of 10%. Its mineral composition is relatively simple, featuring high fixed carbon content and excellent processability. The natural graphite has a carbon content ranging from 94% to 98%, of which large flake graphite accounts for approximately 50%. The flake graphite is the excellent material for expandable graphite, graphene, battery anode materials, and sealing systems for high-pressure pipelines and valves. 


After 12 years of exploration and construction, DH has completed two processing lines fornatural flake graphite concentrate in Phase I, with an annual capacity of 240,000 tons, whichofficially came into production in January 2026. The 120,000-ton production line of Phase Il iscurrently under construction and the 120,000-ton production line of Phase IIl is in planning.With the steady capacity expansion, DH will become a key supplier of natural flake graphite tothe international market.

360,000 tons/year

Production Capacity

350 million tons

Ore Resources

35 million tons

Proven Mineral Resources

50 +

Designed Mining Life

Development History

2014-2016

A small amount of field geological work was carried out, including on-the-spot survey, geophysical survey experiment, exploration trench disclosure and sampling analysis, etc., providing data basis for large-scale formal geological work in the later period.

2017-2018

13 months through the methods of drill bit, trench exploration, geophysical exploration, drill hole water intake test, analysis test sample, beneficiation test sample, and field test, etc, 5 ore bodies have been listed, which confirmed mineral resources of 7.571 million tons.

2019-2021

DH's mining survey team conducted a supplementary survey work in the geophysical anomaly in the northwestern of the mining area, and finally identified 350 million tons of ore resources.

2022-2023

The project is currently in the final construction stage. Phase I the 120,000-ton graphite concentrate processing production line have been basically completed. The bridge which across the Lurio River (which can reduce transportation distances by approximately 300 kilometers) has been completed and put into service.

2024

Other supporting facilities such as roads and power transmission line are also under progressing intensively toward construction completion.

2025

Complete all construction work for the DH project and commence trial production.

2026

On January 31, the DH project officially commenced production. Mozambican President Daniel Chapo attended the opening ceremony, demonstrating the high importance the country attaches to the project.

factory environment

factory environment
factory environment
factory environment

Honorary Qualifications

Honors
Honors
Honors
Honors
Honors
Honors
Honors
Honors
Honors
Honors